Case Study 01
Manufacturing — Order Processing

Log Backup Pauses

SQL Server Disk Pressure Alerting Gap

Every morning at 8:15 AM, their order processing system froze for 4–6 minutes. Users rebooted, blamed the network, blamed the application vendor. Nobody thought to check the log backup job.

No log backup strategy existed. The transaction log was growing unbounded — simple recovery model, disk filling silently. SQL Server was forcing checkpoint stalls to reclaim space. No alerts, no monitoring. It ran at 8:15 AM every day, right when the morning order batch started.

Ola Hallengren scripts for log backup cadence — every 15 minutes, clean and reliable. Disk pressure eliminated by sizing the backup chain properly. Monitoring and alerting so this never goes dark again.

Zero morning freezes since go-live. Disk pressure gone. Clean 15-minute backup cycle. The order processing team starts their day without a 4–6 minute unexplained freeze.

Facing similar silent failures in your environment? Book a 30-minute call
Case Study 02
Billing & Revenue Operations

FoxPro to SQL Server — Revenue Reconciliation Engine

Migration FoxPro → SQL Server ASC 606

Client was running their entire quoting, billing, and revenue recognition process in FoxPro. They were planning a SQL Server migration to "fix performance." On paper, that was the problem.

The real problem went deeper than FoxPro performance. No separation between quote and invoice — they were the same object. No audit trail. No mechanism to handle mid-contract service changes. And a quarterly reconciliation process that required two people three full days to complete manually, every time. They thought they needed a migration. They needed a revenue operating system.

We migrated to SQL Server and rebuilt the revenue recognition engine from scratch. Quote/invoice separation with full audit trail. Parameterized pricing. Proration logic for mid-contract changes. ASC 606 compliance built in. Reconciliation report that runs in under 5 minutes — the manual three-day quarterly process is now fully automated.

Three months after go-live, the reconciliation report flagged an underbilling error on a long-term contract worth more than the entire migration investment. They fixed it, invoiced the difference, and the system paid for itself on that one catch. Quarterly reconciliation went from two people, three days, to an automated report. They asked for a migration. We delivered a financial operating system.

Running legacy billing on an outdated system? Book a 30-minute call
Case Study 03
Healthcare SaaS — Lab Results Pipeline

Oracle to Processing Engine Overhaul

Oracle Batch Processing SLA

A mid-size healthcare SaaS company had an Oracle environment running their lab results processing pipeline. They called for a performance tuning engagement — their nightly batch job that processed 500,000+ records was timing out. It ran 12+ hours on average. With a 6 AM SLA, failures cascaded into downstream system outages daily.

The job was a single monolithic DELETE + INSERT loop — no partitioning, no parallelization, no error handling. Standard AWR tuning and indexing helped, but the architecture couldn't scale out of the problem. We looked at what the system needed to become, not just what it needed to run today.

We stepped back and redesigned their entire ingestion pipeline. Partitioned by processing date. Parallel streaming with bulk loading. Staging tables with MERGE logic for upsert handling. Monitoring dashboard so ops could track job health in real time, with alerting and escalation before the 6 AM cutoff. Job now completes in under 90 minutes.

The 6 AM SLA is never at risk. Processing volume has grown 3× since go-live and the infrastructure absorbed it without changes. But the bigger story is the scope expansion: a performance tuning call became a custom processing engine that became their core platform. Their customers now depend on it daily. What started as a temporary fix became the operational backbone of a SaaS business — it's a core dependency, not a tunable parameter.

Pipeline breaking under volume at the wrong time? Book a 30-minute call
Case Study 04
3PL — Logistics & Operations

Fragile to Agile: Infrastructure Overhaul

Always On AGs High Availability 800 GB

A regional 3PL company was running their entire operation on a single SQL Server instance — no clustering, no real backup strategy, manual deployments, and constant firefighting. Every code deployment was a weekend event. Their main order management database had grown to 800 GB with years of accumulated debt: ad-hoc indexing, no maintenance windows, zero monitoring. A single RAID array held everything.

The environment was fragile by design — single instance, no clustering, no real backup strategy, manual deployments. One RAID array held an 800 GB database with years of accumulated index debt and no maintenance windows. No monitoring meant failures surfaced as user complaints, not alerts. Deployments were weekend events, not automated operations.

Always On Availability Groups for automatic failover and readable secondaries. Tiered backup strategy (full, log, copy-only) automated via Ola Hallengren scripts. Full deployment process with rollback procedures and runbooks so the team could operate without us on-site. Monitoring so problems were visible before customers noticed them.

Zero unplanned downtime in the first 12 months. Deployments went from weekend events to sub-30-minute operations with automated rollback. The environment stabilized enough that the team onboarded three new enterprise clients in the six months after go-live — something that wasn't possible when they were in constant firefighting mode.

Operating without a real failover plan? Book a 30-minute call
Facing a hard database problem?

30 minutes. Walk me through what's breaking. I'll tell you exactly what's wrong and what it would take to fix it.

Book a 30-minute call